C-LINK DTM creates input list files for in-circuit test, flying probe test, boundary scan test and other inspection test systems.
Join us to learn about the immense productivity gains that are possible when using C-LINK DTM integrated environment to manage the entire process from CAD data importing to fixture design/redesign.
Attendees will learn how to get the most out of C-LINK DTM and un-derstand how C-LINK DTM will not just save them time but make them more productive as well.
Learn the “how-to’s” of C-LINK DTM’s Integrated environment and ad-vanced features!
In this webinar you will learn:
How to import board layout, schematics and BOM data.
How to easily detect and solve accessibility problems early enough in the process.
How to prioritize access locations to achieve a well-balanced probe so-lution.
How to analyze board revisions.
How to save time and reuse fixtures
How to produce comprehensive reports in a variety of formats.
C-LINK DTM imports CAD, schematics and Bill of Materials (BOM) data to perform Design For Test (DFT) analysis, to create fixture files and to generate dedicated input list files for specific test and inspection systems.
Presenter Bio:
Mary Elmallakh is the Sr. Software Engineer of C-LINK DTM for Digital-test.
In this role, she is focused on ensuring that the C-LINK DTM family products being created by Digitaltest meet the expectations of test engineers around the world.
Date:
Thursday, February 9, 2012
Time:
2:00pm-3:00pm ET
11:00am-12:00pm PT
Speakers
Mary Elmallakh
Sr. Software Engineer
Mark Harding
Director of Sales
Register Now >>
Simply reply to this email to reg-ister and connection details will be sent to you.